Aqua Pro 69717 9 1/2" Long Lead Free Magnesium Anode Rod with 3/4" Male Pipe Thread
Regular price
$28.85 CAD
Sale price
$28.85 CAD
Regular price
$29.50 CAD
Save 2%
MPN:
69717
Manufacturer:
AQUA PRO
-
Estimated Delivery :Jun 09 - Jun 13
-
Transit Time : Transit Time for this product is around 2 - 4 days.
Aqua Pro 69717 9 1/2" Long Lead Free Magnesium Anode Rod with 3/4" Male Pipe Thread
Regular price
$28.85 CAD
Sale price
$28.85 CAD
Regular price
$29.50 CAD
Product description
- For suburban and MorFlo water heaters
- Lead free
- 9 inches long
- 3/4 inch male pipe thread
- Bulk
Top Brands